top of page
TSB Cheapside 1.png

TSB BANK
STAIRWELL

PROJECT:

Installation of handrail and glazing

SCOPE OF WORKS

PROJECT BRIEF

To remove existing handrail and replace with new. Work to include the supply and fit of made to measure glazing specifically produced for the job. Modifications to location of handrail to allow suitable distance from wall to rail.

GALLERY

BEFORE

AFTER

bottom of page